As part of the HEPHAESTUS project, physical optical fibre infrastructure at NCSR Demokritos was upgraded to support inter-building connectivity and future network improvements.
An announcement dated 1 July 2022 confirmed that the fibre cable installation phase had been completed, with termination work scheduled to begin at key locations including the Physics and Informatics buildings.This work marked an important stage in upgrading the passive network infrastructure and preparing for subsequent connectivity and active-equipment deployment phases.
